• 201, 17205 106A Avenue NW, Edmonton, AB T5S 1M7
  • 780-482-2557
  • services@sameng.com
Author: Sameng
23 June 2016 - 8:06, by , in Front Page Slider, Resource Development, Comments off
Mr. Maykut has been operating a small gravel extraction operation near the southeast corner of his property since the early 1960’s. The Maykut pit is located approximately 120 km northwest of the City of Edmonton and 35 km north of the Town of Barrhead.  Upon inspection by Alberta Environment in November 2011, Mr. Maykut was...
23 June 2016 - 7:53, by , in Front Page Slider, Resource Development, Comments off
Kanata Métis Cultural Enterprises Ltd. (Kanata) wants to develop a gravel extraction operation within the W½ 20-51-25-W4M, within the City of Edmonton, along the west side of the North Saskatchewan River. The project is intended to provide employment and economic development opportunities for the Métis Nation. Upon completion of the gravel extraction, the area will...
23 June 2016 - 7:18, by , in Front Page Slider, Industry, Comments off
Sameng has been involved continuously in the design of an expanding industrial park near Lloydminster, AB for nearly ten years. The site is being developed from agricultural land to large industrial lots. Our work has covered two phases of development and we are currently working on the third phase. The design work includes site grading,...
22 June 2016 - 15:34, by , in Front Page Slider, Industry, Comments off
The Penn West Lobstick Cardium Water Intake System is located on the North Saskatchewan River in Brazeau County, approximately 15 kilometers outside of Drayton Valley. Penn West was experiencing low infiltration rates at their water intake system due to build-ups in the intake system’s piping and at the intake piping slotted perforations. Sameng was retained to re-establish...
22 June 2016 - 15:07, by , in Front Page Slider, Industry, Comments off
North West Redwater Partnership (NWR) is currently in the design and construction phase of a bitumen refinery located in the Sturgeon County’s portion of the Industrial Heartland. The Sturgeon Refinery is planned to be constructed in three stages over an approximate 10 year time-frame starting in 2013. During the construction period, the work force i...
22 June 2016 - 13:54, by , in Front Page Slider, Municipal Engineering, Comments off
The City of Edmonton has improving the level of flood protection in the Duggan neighbourhood in south-central Edmonton by constructing a stormwater management facility and corresponding sewer upgrades. The Duggan SWMF is located at Charles Anderson Park. The improvements should improve the level of service to a 1:100 year rainfall event in the vicinity of...